Old furniture meets new house.

Open living area.

Smitten with our House By The Water.

Our boxes and furniture arrived.  The kitchen boxes took me a full weekend to unpack and I’ve declared a ban on any further kitchenware purchases.  Our plentiful kitchen storage is full.

Kitchen bench, caesarstone.

Alpine Mist Caesarstone and the splash back tile dilemma, well and truly resolved.  Pot stand made by my Nan.

This 3 day weekend, my mission is to clear the house of all the other boxes.  I’m spurred on by a special request from a South African reader for photos of our void area and by the impending arrival of an important guest, Aunty Kate.

Our living room (with void) is furnished temporarily with old furniture:

Living area void.

View of our living area from the second floor.

Living area.

I have big plans for this living area, but I have to be patient.  In the end, practicality won over lust and I’ve ordered this sofa:

Lazio Daybed.

Lazio Daybed by Weylandts.

The sofa is coming from South Africa and is due to arrive in May.  I’m taking that to mean July, because everything seems to arrive later than advertised.  (Hello?  Bed I ordered in December.  Shutters I ordered in October.  Are you there?)  When the sofa arrives, I shall borrow some rug samples from Frisky Deer and will select a rug to complement the new sofa and the “I.O.U. artwork” that is yet to be purchased following a conspicuous birthday a certain time ago.

I’m only half way through my box emptying spree, but I feel like showing off our living area.  I’ve earned a short break…

Open living area.

Open living area.

Through the chaos of the week, I’ve enjoyed finding little spots that give me pleasure.  Honestly, everything looks better with timber floors:

And finally, a preview of our powder room:

Clamshell Caesarstone.

The arty-farty version. Clamshell Caesarstone.

Powder room.

The real version.

Never without a hitch. 

Good news first.

Doesn’t our kitchen look swish?

kitchen

House By The Water kitchen.  I think I might “pin” that.

I glammed the house up a bit with some greenery in honour of my Mum’s visit and the return of The Three Little Pigs from holidays with grandparents.

Kids' bathroom.

The Little Pigs’ wash trough, with maiden hair fern sitting atop the laundry chute.

girls room

Christmas gifts for our 11 year old pig included an Armadillo & Co rug and bedding from Adairs. Furniture still in transit.

The fireplace saga….

 Round one of fireplace saga took place a year ago, I won’t bore you with the details.  Round two of fireplace saga started with us collecting our fireplace from storage last month to find that we only had 4 metres of flue.  No good for a 6+metre building.  A few extra days and we soon had some extra flue.  Next, the fan kit for the heater ($750) was nowhere to be found.  Storage upturned and triple checked, supplier contacted and no evidence that it was delivered or not.  Nice Wolf huffing and puffing (enough to circulate heat around house). No chance of paying for another.  Fireplace installer and supplier both agree that fan is not necessary.  Fireplace installed without fan and with a frame that’s sort of just hanging loosely off the wall….

Moving on.

Driveway.

A quick rush to get the driveway concreted before the timber floors were to be finished.  The aim was to have an access point to the house that doesn’t involve traipsing through sand.  A couple of quotes later and a bobcat was ploughing sand out of our front yard.  Well worth the $300 + clean fill when compared to the hours of digging that would be the alternative.  I’d never have thought we’d have 3 truckloads of sand/dirt to clear.  All was going well until a little water spring appeared from the water meter.  “It was already leaking.  Can’t you tell by the green grass around it?”  “Fair enough”, I said, wondering if there was also a leak from our letterbox which also has a green patch of grass.

I supplied the concrete contractor with a copy of council’s requirements for driveways, but thought that this should be old hat for any local concreter.  If you follow council’s requirements, they’ll reimburse you for some of the cost of the “crossover”.  Well, they almost got it right.  No expansion joint at our property boundary….maybe I should get them to come back?   Maybe it’s too late.

concrete driveway

The base for our future cobblestone driveway.

Our window shutters were due to be installed mid January.  When I inquired about progress last week I was told there was a “slight delay” of a few more weeks due to one of the shutters being unusually small.  Hmmm…..

Our timber floors are currently having “a rest” before being sanded and finished.  The blackbutt stairs and our curved void area are quite impressive.

 So, there you have it.  Progress, albeit with hitches.

Coming up:

  • Tree farms.
  • Floor finishing, I hope!
  • The return of our furniture.
  • How are the builders tracking with the pre-handover list?
  • And, you never know your luck, a pool before winter?