How cabinets made my day.

Fearing another slow week, I decided to trial a new strategy to keep work progressing rapidly at House By The Water.  Bribery.

Our builders, Webb and Brown-Neaves asked me to meet the tiler on site on Monday, so first thing in the morning I left the tiler a box of chocolates hoping it would make him work at his best.  I know that the tiling is a big job and a critical one in the pathway to the builders handing over the keys on December 18th.  Well I’m not sure that it had the desired effect, (any tilers reading, please send in your suggestions,) but we do at least now have the bathroom and ensuite screed.

Bathroom screed.

Kids bathroom. Note: hole in floor for laundry shute.

Ensuite screed

Ensuite

The renderers have started to add the final textured layer to the house exterior:

Grey pebble render.

Dulux Grey pebble render.

I collected some render that had fallen to the ground to take to the tile shop.  I need to select a tile to cover the top face of the patio awning.  I want it to be inconspicuous.

The concreter poured the garage floor and a concrete plinth beside the house for the air conditioning unit to sit on:

Grano garage floor.

Grano garage floor.

A couple of broken windows have been replaced and some interior scaffolding is in place.  I hope it means that the painter will start soon.

But the highlight of the week is definitely the arrival of the cabinets.  My mum sent me a text message during the day…”There’s a large furniture truck outside your house.”   Oooooh!   Cabinets!  Cabinets for the kitchen, scullery, laundry, bathroom and ensuite.  Lots and lots of beautiful storage.

What a giant puzzle it must be now to put it all together.

For those of you who are missing my little chats about interiors, I promise a short break from building talk next week.  I’ve been making a few exciting purchases and plans for our interior but I can’t reveal them just yet.

External paint revealed.

External paintThank goodness for a new photo and a smidgeon of progress at House By The Water.  The scaffolding that was getting in everyone’s way, and seemed to be the cause of a two month standstill, was finally lowered.  And, ta da! The external colours of the house are revealed.  I’m rather happy with my paint choices.  Although I spent weeks deciding what interior colours to use, the exterior paint was a 5 minute decision.  I showed Webb and Brown-Neaves’ interior designer a picture of a house exterior that I liked and muttered something about grey.  She said “How about Grey Pebble with Calfskin?” as she poked a couple of sample strips in my direction and I said “OK”.  Done.

The trim, between the roof and the top of the brick work, is Dulux Calfskin and the paint over the render that’s on the top of the window and on the feature column is Dulux Grey Pebble.  (People like to know these things!)  The roof is Colorbond Surfmist.

The plasterers were due to start and finish the internal plaster on the first floor last week, but my spies dropped by on the weekend and couldn’t find any new work.  Ho hum!  This week should be action packed  with ceiling fixers and external renderers both scheduled to be on our site.  Keep your fingers crossed for me, otherwise it’ll be a post on housing pets next week and I’d rather it didn’t come to that.

On a side note, this week I had

My 15 minutes of fame!

In case you missed it, I was interviewed about my purchase of an original Coco pendant as opposed to a replica.  You can read the article on Domain News.

The Coco pendant. A work of art. Source: Coco Flip.

The Coco pendant. A work of art. Source: Coco Flip.

In response to the article my blog stats did a bit of a flip of their own, and, ahem, check out the hits counter!  It reached over 100K views.

Secondly, an anonymous blog reader nominated House By The Water for the U.K. based, Amara Interior Blog Awards in the Australian category.  Thank you to Mr. or Mrs. Mystery and “hello” readers from the U.K.. If you wish to vote, click on the icon below:vote-now

Okay.  I’ll get back in my box now.  Awkward moment.

Feeling bolstered by my newfound “fame” I decided to test out a suggestion made on the HomeOne forum to another home builder.  Remember the cobblestone driveway saga?  Think $$$$.  After getting yet more crazy quotes for the driveway, my husband and I decided we’ll have a go at it ourselves.  Some of my Instagram friends even offered to turn up with scones and help!  (One might be forgiven for assuming this means that we eat scones and chat while we watch the Nice Wolf, a.k.a. husband, lay cobblestones.  But if you’ve seen my Insta friend, Lady Jo, with her tools, you’d know that her offer is sincere.  But I digress…)  So the suggestion was to ask suppliers for trade prices in return for displaying a sign advertising the product.  Since House By The Water will be highly visible, I thought there was some potential for this idea and I asked Eco Outdoor for a discount on cobblestones.  I received a polite and prompt response, offering a rate of $121 per square metre.   $10 per square metre more than my previous quote.  Ha ha ha! The price of fame….

Cobblestones are everywhere here in Brazil. Might have to pack a suitcase full.

Cobblestones are everywhere here in Brazil. I might have to pack a suitcase full.

Build update: render started.

 It has been so quiet on the build front over the past month that I sent in my spies to see if any work had been done at all.  The external cladding just below the roof has been installed.  It looks very white now, but it will be painted in Dulux’s Calf Skin.  The space between our ceilings and the roof is rather huge.  The roof line was raised by three courses of brick to accommodate the ducted air conditioning.  

The renderer has started covering the highest bricks and I suspect is now waiting for the scaffolding to be lowered before he can proceed.   I’m imaging that the process goes something like this:

  • Wait for renderer. Render a bit.
  • Wait for scaffolders.  Drop a lift.
  • Wait for renderer. Render a bit.
  • Wait for scaffolders again. Drop a lift.
  • Wait for renderer.  

All quite understandable, but I wasn’t mentally prepared by the construction schedule for this, so I’m feeling twitchy!  

The render will be painted Dulux’s Grey Pebble at a later date.  (Oh no!  I suppose that means the painters are going to have to wait on scaffolding too.)  The central column on the facade will be clad in stacked stone.  I’m rather pleased about that having seen some fantastic stacked stone today, used not only on the exterior, but also in a double shower with sky light ceiling.  

A big thanks to my friends who sent me lots of photos of House By The Water this week.